avn Homepage


Photographs of Lines 1+2
after their completion
Indoor views

Below an indoor tour is given of the thermal waste utilisation plant of EVN Abfallverwertung NÖ:

Control centre – the heart of the plant
View of the crane control desks for the bunker and slag cranes
Control centre – the heart of the plant
View of the crane control desks
for the bunker and slag cranes
Control room operator monitoring and controlling the plant
Visitor information centre
Control room operator monitoring
and controlling the plant
Visitor information centre
Visitors being shown the introductory 3D movies
Magnetic separation of scrap metal for recycling
Visitors being shown
the introductory 3D movies

Magnetic separation of scrap metal
for recycling

Slag bunker for inert incineration residues
About a quarter of the garbage remains as slag residue
Slag bunker for inert incineration residues

About a quarter of the garbage
remains as slag residue

The grate where waste is incinerated at more than 100°C
The interior of the boiler where steam is generated in the pipes
The grate where waste is incinerated
at more than 1000°C

The interior of the boiler where
steam is generated in the pipes

Kesselinnenraum
Guckloch auf den Verbrennungsrost
Inside the boiler

Inspection hole to view the grate

Garbage burning on the grate
Waste water treatment

Garbage burning on the grate

Waste water treatment

Waste water treatment
Chamber filter presses – waste water treatment and filter cake separation
Waste water treatment

Chamber filter presses – waste water
treatment and filter cake separation

Slag discharger
Fabric filter
Slag discharger

Fabric filter

Wet flue gas scrubber
Wet flue gas scrubber
Wet flue gas scrubber

Wet flue gas scrubber

Waste bunker, rail container discharge opening to the left, truck discharge opening at the back

Waste bunker, rail container discharge opening
to the left, truck discharge opening at the back